LOONAR

Power and electrical tender analysis, read against the IEC series

Transmission tower and power lines silhouetted at dusk

From thousands of pages to structured data

A guaranteed loss figure is not a specification, it is a price. Miss the penalty attached to it and the cost surfaces once the contract is running.

Ratings and impedance

Every unit and panel, read against the IEC series

Loonar pulls the distribution transformers, grid units, switchgear and auxiliary supply out of the tender and lists each tag by tag: rating, HV and LV voltages, vector group, impedance, cooling, tap changer and the IEC standard it answers to, with the bay reference and page cited alongside.

Technical deviations

Type-test and loss-guarantee deviations

Loonar rolls values up against your type-test evidence, so short-circuit withstand is one row for the whole 132/33 kV scope, not a check per unit. A report held for an 8 MVA design instead of the 10 MVA, on-load tap changers at twenty-two weeks, a loss penalty you cannot underwrite, cast resin below your smallest frame: each becomes a deviation with its items and the register behind it.

Projects › Your Company Ltd.
Projects › Your Company Ltd.

The clause register

Clause-by-clause review of grid tender conditions

Every clause is classified, risk rated and checked against your standard positions. Losses capitalised at eight thousand pounds per kilowatt, customer minutes lost passed through as supplier liability, a five-year warranty that pauses during outages: the four clauses carrying real exposure surface above the twenty-eight already aligned.

Explore solutions

Other industries Loonar reads

See what Loonar reads in your package

Book 30 minutes and bring a real large RFQ. We run your own package through Loonar and show you the requirement list it builds, every value carrying its page and the standard behind it.