Component manufacturer RFQ analysis: the whole package read before bid or no bid
From thousands of pages to structured data
The requisition says bid; the painting spec on page 287 says what it costs
Requisition and datasheets
The requisition, the equipment list and every datasheet behind it, read as one
Loonar starts where your sales engineer starts, reads what must be supplied, by when and for which site, checks the document list against what actually arrived, then extracts every parameter from each line item and its datasheet with the page on every value.
Technical deviations
Inspection, testing and painting spec deviations
Loonar rolls the datasheets up against your build standard and reads the specifications layered on top of them, so a coating your works does not apply, a string test your rig cannot run and a vendor list that excludes your castings supplier arrive as decisions before bid or no bid, each with the line items it affects.
The clause register
The purchase conditions, assessed before you commit
Every clause is classified, risk rated and checked against your standard positions, so retention held until plant handover, warranty running from commissioning rather than delivery, and inspection costs passed back to the supplier at every hold point sit on the table while you can still price them or deviate them.
Explore solutions
Other industries Loonar reads
See what Loonar reads before you bid
Book 30 minutes and bring a real requisition and its attachments. We run your own package through Loonar and show you the requirement list it builds, including the ones you would have reached on day five.