LOONAR

The whole package, read before you decide to bid

Flanged gate valve on a painted pipe run

From thousands of pages to structured data

The requisition says bid. The painting specification on page 287 says what that bid costs, and you read it after the price is out. Nothing was priced, nothing was deviated, and the requirement is still enforceable.

Requisition and datasheets

The requisition, the equipment list and every datasheet behind it, read as one.

Loonar starts where your sales engineer starts, reads what must be supplied, by when and for which site, checks the document list against what actually arrived, then extracts every parameter from each line item and its datasheet with the page on every value.

Technical deviations

Every deviation identified, ready for your decision.

Loonar rolls the datasheets up against your build standard and reads the specifications layered on top of them, so a coating your works does not apply, a string test your rig cannot run and a vendor list that excludes your castings supplier arrive as decisions before bid or no bid, each with the line items it affects.

Projects Your Company Ltd.
Projects Your Company Ltd.

The clause register

The purchase conditions, assessed before you commit.

Every clause is classified, risk rated and checked against your standard positions, so retention held until plant handover, warranty running from commissioning rather than delivery, and inspection costs passed back to the supplier at every hold point sit on the table while you can still price them or deviate them.

Explore solutions

The rest of the range.

See what Loonar reads before you bid.

Book 30 minutes and bring a real requisition and its attachments. We run your own package through Loonar and show you the requirement list it builds, including the ones you would have reached on day five.