LOONAR

Part manufacturer RFQ analysis: every bill-of-materials line with its standard

Welder joining a steel section in a fabrication shop

From thousands of pages to structured data

Four hundred lines in the bill, each with a quality standard written somewhere else in the package. The line you priced without reading it is the one that comes back as a claim.

Bill of materials

Studs, flanges and tube, each read with its material spec and certificate level

Studs, bolts, fittings and tubes come out line by line with grade, dimension, material specification, coating, heat treatment and certificate level attached, each value cited to the document and page it came from.

Technical deviations

Certificate level, marking and coating deviations

Loonar groups the bill by the standard behind it, so one heat treatment requirement covering ninety-one lines is one decision, and the grade you do not hold, the certificate level above your mill's scope and the coating outside your works' qualification each arrive with the lines they affect and the page they came from.

Projects › Your Company Ltd.
Projects › Your Company Ltd.

The clause register

Clause-by-clause review of repeat supply conditions

Every clause is classified, risk rated and checked against your standard positions, so a certificate obligation, an open-ended retest at your cost and a warranty that outlasts the part surface on the order that repeats them, not on the one that finally goes wrong.

Explore solutions

Other industries Loonar reads

See what Loonar reads in your bill of materials

Book 30 minutes and bring a real order package. We run your own bill through Loonar and show you every line with its quality standard attached, each value traceable to the document and page it came from.