LOONAR

Every spec, every standard read before you price

Aerial view of an LNG storage terminal on the coast

From thousands of pages to structured data

Every requirement here carries a document. Miss the requirement, you have a deviation. Miss the document, you are out before anyone reads your price.

Hydrogen and emissions parameters

Every station valve, read against EN, ISO and the hydrogen case.

Loonar lays out the station, pipeline, blend skid and metering scope tag by tag: bore, pressure, weld prep, body material, seat and seal, hydrogen readiness and ISO 15848-1 emissions class, so 100% hydrogen on the station and a 20% blend on the buried section sit side by side, each value carrying its page.

Technical deviations

Every deviation identified, ready for your decision.

Loonar rolls values up against what you have actually qualified, so hydrogen readiness is one row covering 24 items, not 24 checks, and each gap (a 20% blend ceiling, Class AH on two body sizes only, a missing embrittlement data pack, an unstated hydrogen scope on the metering skid) becomes a deviation with its register.

Projects Your Company Ltd.
Projects Your Company Ltd.

The clause register

The network operator's terms, assessed.

Every clause is classified, risk rated and checked against your standard positions, so the three that matter (an unsupportable life-of-asset hydrogen warranty, a 60-month term tied to energisation, five years of unpriced leak reporting) surface above the 27 already aligned.

Explore solutions

The rest of the range.

See what Loonar reads in your package.

Book 30 minutes and bring a real network RFQ. We run your own package through Loonar and show you the requirement list it builds, every value carrying its page and the code behind it.